# Pick up the correct step used for scheduling a project by C.P.M. _____ ? with Answer - Mechanical Engineering Mcqs | TestPrep

> Solved MCQ: Pick up the correct step used for scheduling a project by C.P.M. _____ ? Correct Answer: E. all of the above. Verified answer explanation for FPSC, PPSC, MDCAT, NTS, and CSS competitive exam preparation.

---

Tested in Competitive Exams:

- [NTS Test Prep](https://test-prep.blog/exams/nts)
- [FPSC Past Papers](https://test-prep.blog/exams/fpsc)
- [PPSC Solved MCQs](https://test-prep.blog/exams/ppsc)
- [PMDC MDCAT 2026](https://test-prep.blog/exams/mdcat)
- [UET ECAT Prep](https://test-prep.blog/exams/ecat)
- [CSS Central Superior](https://test-prep.blog/exams/css)

- [Mechanical Engineering Mcqs](https://test-prep.blog/categories/mechanical-engineering-mcqs)
Difficulty: Moderate 72% Accuracy

# Pick up the correct step used for scheduling a project by C.P.M. _____ ?

Direct Answer & Quick Reference

The correct option is **E. all of the above**.

A. a project is divided into various activities

B. required time for each activity is established

C. sequence of various activities is made according to their importance

D. network is drawn by connecting the activities and the events

E. all of the above **(Correct Answer)**

Verified Key: E. all of the above
Solved by 2,752+ students

Verified against official examination board answer keys and standard curriculum textbooks.

- [Previous Question The patrol is distilled at a temperature from :](https://test-prep.blog/mcq/the-patrol-is-distilled-at-a-temperature-from-1b1ae628-c41f-4e8c-b36b-585b4f64fa91)
- [Next Question Which of the following are used in diesel engines and oil fired boilers :](https://test-prep.blog/mcq/which-of-the-following-are-used-in-diesel-engines-and-oil-fired-boilers-bc69d84b-a5e7-4469-9ce9-c6b6ca5ebf28)

- [Practice More Mechanical Engineering Mcqs MCQs](https://test-prep.blog/quiz/smart?category=mechanical-engineering-mcqs)
- [How We Verify Questions →](https://test-prep.blog/editorial-policy)

## Subject Overview

Explore thousands of solved past paper MCQs for Mechanical Engineering Mcqs categorized with explanations.

- [Browse All Mechanical Engineering Mcqs MCQs →](https://test-prep.blog/categories/mechanical-engineering-mcqs)

## Related Questions

- [The patrol is distilled at a temperature from :](https://test-prep.blog/mcq/the-patrol-is-distilled-at-a-temperature-from-1b1ae628-c41f-4e8c-b36b-585b4f64fa91)
- [Which of the following are used in diesel engines and oil fired boilers :](https://test-prep.blog/mcq/which-of-the-following-are-used-in-diesel-engines-and-oil-fired-boilers-bc69d84b-a5e7-4469-9ce9-c6b6ca5ebf28)
- [The hydraulic turbines are also known as : _____ ?](https://test-prep.blog/mcq/the-hydraulic-turbines-are-also-known-as-c4281981-41df-4884-900c-0e42a3130767)
- [Which of the following is mostly used used as blast furnace fuel for extracting pig iron from iron ores?](https://test-prep.blog/mcq/which-of-the-following-is-mostly-used-used-as-blast-furnace-fuel-for-extracting--d17a6b4a-fb6a-4d81-9aa0-7d0704d3d22f)
- [Which of the following solid fuel has high carbon content?](https://test-prep.blog/mcq/which-of-the-following-solid-fuel-has-high-carbon-content-23ab9cf2-4a63-4460-9aa4-9651149f7b7e)

---
*Source: https://test-prep.blog/mcq/pick-up-the-correct-step-used-for-scheduling-a-project-by-cpm__________________-13a53a50-3692-40c3-b0a7-3549b1eb3227*
*Format: Markdown for Agents (Content Negotiation: text/markdown)*